Technical Parameter:
Model | YG-SKD70 | YG-SKQ70 | YG-SKD100 | YG-SKQ100 | YG-SKB100-4 /SKB120-5.5 |
Drilling diameter(mm) | 65-90 | 60-90 | 90-130 | 90-130 | 90-130 |
Applicable rock formation | 20 | 20 | 20 | 20 | 20 |
Drilling depth(m) | 15 | 15 | 25 | 25 | 40 |
Rotating speed of drilling tool(r/min) | 110 | 110 | 84 | 110-160 | 90 |
Use air pressure(Mpa) | 0.5-0.7 | 0.5-0.7 | 0.5-1.0 | 0.5-1.0 | 0.5-1.0 |
Air consumption (m3/min) | 3.5 | 10 | 6 | 12 | 10 |
Cylinder diameter(mm) | 90 | 90 | 140 | 140 | 140 |
Advance effective itinerary(mm) | 1070 | 1070 | 1070 | 1070 | 1070 |
Maximum thrust(N) | 3600 | 3600 | 9600 | 9600 | 9600 |
Motor Power(KW) | 3 | / | 4 | / | 4/5.5 |
Motor voltage(V) | 380 | / | 380 | / | 380 |
Rated speed(r/min) | 1440 | / | 1440 | 3200 | 1440 |
Drill pipe outer diameter(mm) | 42 | / | 50-60 | 50-60 | 60 |
Drill pipe length(mm) | 1025 | 1025 | 1025 | 1025 | 1025 |
Size(mm) | 1740*260*420 | 1740*260*420 | 2280*440*550 | 2230*380*550 | 2230*380*550 |
Weight(kg) | 320 | 320 | 470 | 450 | 460/480 |
Product Details:
Company Information:
Packing&Shipping:
FAQ:
Q Do you provide samples?Is it free?
A Yes, we could offer you the sample, but is is not free.
You need to pay the cost of sample and freight.
Q What can I get the price?
A We usually quote within 24 hours after we get your inquiry. If you are very urgent,
Q What is your term of delivery?
A We accept EXW, FOB Shenzhen or FOB Guangzhou. You can choosethe one which
is the most convenient or cost effective for you.
Q What about the lead time for the mass production?
A Honestly, it depends on the order quantity and the season you place the order.
Packing&Shipping:
FAQ:
Q Do you provide samples?Is it free?
A Yes, we could offer you the sample, but is is not free.
You need to pay the cost of sample and freight.
Q What can I get the price?
A We usually quote within 24 hours after we get your inquiry. If you are very urgent,
Q What is your term of delivery?
A We accept EXW, FOB Shenzhen or FOB Guangzhou. You can choosethe one which
is the most convenient or cost effective for you.
Q What about the lead time for the mass production?
A Honestly, it depends on the order quantity and the season you place the order.
Q